Heinzinger Automotive & E-Mobility

Automobil Branche und Elektromobilität unter Strom

Quelle/Senke Systeme von Heinzinger versorgen
unterschiedliche Anwendungen passgenau

To test hybrid or all-electric drive systems, real batteries or a battery simulator can be used as the energy source. If reproducible results are needed, the battery simulator is the better choice since the properties of a battery can be determined by a range of parameters.

To be able to simulate a high-voltage battery with ideal properties or as closely to real conditions as possible, particular demands are made of the source / sink system used.

Conditions for the successful simulation of HV batteries

The fundamental requirement is a stable output voltage which can be controlled with high dynamism and precision even with rapid load changes. The ERS series meets this requirement by using complex and flexible digital control algorithms, implemented with DSP and FPGA structures, as well as fast-cycled power semiconductors.

The digital setup of the control circuit means that even the battery's internal resistance can be mapped with a high degree of dynamism. Depending on a specified internal resistance and the momentary current value, a new voltage target value (battery terminal voltage) is calculated and controlled with each control cycle (48 µs).

As an option and in addition to the standard internal resistance control, further highly dynamic battery models (R-C links) can be made available inside the device via the control circuit. The output values are also recalculated with this option every 48 µs.

Integrating voltage profiles in real time

An extremely fast change rate in the target value specifications can be implemented via a digital CAN interface, which is already included as standard, at up to 1 kHz. This allows voltage profiles (e.g. from external customer-specific battery model calculations or previously demonstrated driving profiles) to also be integrated into the battery simulation in “virtually real time”.

Elektromobilität zuverlässig mit der
zentralen Ressource versorgen: Strom

Ohne Quelle/Senke Systeme läuft im Bereich der Elektromobilität praktisch nichts, denn Strom ist der neue Treibstoff und für sämtliche Systeme und Komponenten unerlässlich. Damit diese optimal zusammenarbeiten und unter verschiedensten Bedingungen getestet oder in Fahrsimulationen überprüft werden können, setzen die Entwickler für Elektromobilität auf DC High Voltage Power Supplies von Heinzinger. Denn damit können die Belastungen von Bordnetz, Elektro-Antrieb und Batterie genauso überprüft werden, wie Ladevorgänge oder die Einwirkung extremer Umweltbedingungen, die sich auf die elektrischen Komponenten im Bereich Elektromobilität negativ auswirken können.

Send your request now

Would you like to know more about power supplies from Heinzinger?

You might also be interested in

DC Source / Sink

oltage, Current, Power: Is that all there is to a Power Unit?

more
EOL Test

Quality and Reliability: Success Criteria in Series Production

more
Starter / Alternator Test

Power units for the starter battery, starter motor and electric system

more
Test Charging Stations

A Sticking Point for the Acceptance of Electromobility

more